Government Project

1. AC SOLAR POWER SYSTEM PROJECT IN NIGERIA

Nigeria president election, 30000sets Power System from Nigeria government,

In Oct. of 2010, SAKO was the manufacturer which make the power systems for Nigeria government presidential election .

The picture below was SAKO warmly welcome Nigeria government minister and Embassy counselor visit:



The leading time is only 35 days, 30,000 sets power system include 2PCS 40AH lithium batteries , one inverter ,the output was DC19V and DC30V,one charger, and a backpack. Below picture showed the urgent production.



As all the goods should be shipped by air, the package must meet the flying requirement. And in Nigeria, it was in rain season, so the package should be water proof type. below was the packaging picture.

The goods were loaded into the container which went to the Hongkong airport.

we rent 4 air planes No.737 to take above 30,000 sets power products to Lagos air port.



2. DC SOLAR POWER SYSTEM PROJECT IN PAKISTAN

In June of 2017, the tender from Pakistan, the complete system includes DC Box, Solar Panel 50W/18V , DC Light 12V5W*3pcs, DC Fan 1Piece. SAKO was the manufacturer of the DC Box, Solar Panel and LED light, the qty is 2100sets.

In April of 2018, the same tender from Pakistan, the 2nd time SAKO was the manufacturer , the qty is 4700sets.


Project Location: Pakistan

DC box built-in PWM controller+lead acid maintenance free battery

Solar Panel: 50W/18V Poly

LED Light: 12V5W*3PCS

The picture below are the products which SAKO produced in factory: 


                 
 

The leading time is 25 days , need to finish all the 4700pcs solar panel and 4700pcs DC BOX, and load 4 containers in SAKO factory, below are the container loading pictures:



3. SOLAR WATER PUMP SYSTEM IN YEMEN

Project Location: Hodeida, Yemen

Installation date: Jan. 2016 and Jan. 2017

QTY: 18 sets

Deep well Pump: 30KW (Offered by user)

Pumping Inverter with waterproof cabinet: 37KW

Solar panel: 180pcs*300W/36V poly panel

PV combiner box: 12 in 1 out


                 
                 
               

                 
 
 
 


4. 11 METERS SOLAR STREET LIGHT SYSTEM IN ZIMBABWE,

Project Date: Sept.2018

QTY: 45 sets

Project location: ZIMBABWE

Mounting height(m): 11 meters

Solar panel power: 645W high efficiency poly Poly crystalline silicon

Battery Type: 12V/200AH*4pcs maintenance free

Lighting source: 200W ( 4PCS*50W LED module)

MPPT solar charge controller: 12V/10A*3PCS

AD box: W1360mm x H2260mm, 2pc AD light box for each set. (The total light power source is 60W)


Working hours:                                                          

Sunny day: 12 hours per day ( first 5 hours working at 100% power, and the next 5 hours auto shifts to energy saving mode working (about 50% power) . About 10 continuous rainy/cloudy days at energy saving mode once the batteries are fully charged


Main features:

Timer and dimmer functions, all around protection functions such as: over charge , discharge protection,waterproof, temperature compensation,etc. User can set up the working hours and working mode as needs by remote control. Anticlimactically work and unattended operation from dusk to dawn.


 
 
 

Basic Information
  • Year Established
    --
  • Business Type
    --
  • Country / Region
    --
  • Main Industry
    --
  • Main Products
    --
  • Enterprise Legal Person
    --
  • Total Employees
    --
  • Annual Output Value
    --
  • Export Market
    --
  • Cooperated Customers
    --
Chat with Us

Send your inquiry

Choose a different language
English
Magyar
Zulu
Українська
Türkçe
русский
العربية
Deutsch
Español
français
italiano
Português
Current language:English